What is the LVT Floor Laying Process

2023-09-25 17:45


1. Measure the area of the room
Before installing the floor, itis necessary to accurately measure the paving area of the room in order to beaware of the material loss during the entire paving process.
2. Grassroots treatment
The first step before the flooris formally laid is the grassroots treatment, which is mainly to repair theproblem ground to form a new base layer to avoid the arching of the floor dueto the hollow and cracks of the original base layer. After the base layer iscompleted, the ground needs to be leveled. If the ground is uneven, not onlywill the skirting line have gaps, the overall floor will also be uneven, andthere will be abnormal noises, which will seriously affect the quality of thefloor.
3. Leveling the ground

The level error of the ground cannot exceed 2mm, if it exceeds,find a way to level it. If the ground is uneven, not only will the skirtingline have gaps, the overall floor will also be uneven, and there will beabnormal noises, which will seriously affect the quality of the floor.